WHAT HAPPENED TO THE SILVER LAKE DAILY NEWSLETTER that was filled with daily news stories and used to attract hundreds of readers? Click on the ??? link for the story.
CURRENT CONTACT INFORMATION: 585-483-8435; Email: greg.franklin.perry.ny@gmail.com; Mail: G. Franklin, PO Box 19, Silver Lake NY 14549.

Thursday, October 11, 2018

Perry Village Seeks Lake Communities' Opinions on Perry Beach Improvements

The Village of Perry has retained SWBR of Rochester to prepare an update to the master plan for Perry Beach. In 2017, a schematic plan was developed as part of the Silver Lake Feasibility Study and included improvements based on community input. To refine the master plan, the Village Steering Committee is seeking your input on the elements to include in the project.

Below are a series of features initially identified in the Silver Lake Trail Study. Your input will help prioritize individual elements and guide the master plan design.  Please indicate the priority you believe the Village and design team should give to each. A ranking of 5 is High priority (necessary and desirable) to 1, Low priority (not necessary and not desirable).  Please reference the Perry Beach Schematic Design from the Silver Lake Trail Feasibility Study.



Perry Beach Schematic Design

Perry Beach Schematic DesignTo offer your opinions and preferences, click on this link  and follow it to the end where the multiple choices are located. Click on:  https://www.surveymonkey.com/r/QQMPRWM

No comments:

Post a Comment

Genuine commenting is warmly welcomed--Advertising is not welcome in the Comment Section and will be removed without further explanation.